Highway Engineering The camber of shoulders in water bound macadam roads is zero greater than the cross slope of pavement less than the cross slope of pavement equal to the cross slope of pavement zero greater than the cross slope of pavement less than the cross slope of pavement equal to the cross slope of pavement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 0.168 cm -0.168 cm 7.768 cm 7.432 cm 0.168 cm -0.168 cm 7.768 cm 7.432 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Desire lines are plotted in speed studies accident studies origin and destination studies traffic volume studies speed studies accident studies origin and destination studies traffic volume studies ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of hill roads, the extra widening is generally provided one-fourth on inner side and three-fourth on outer side of the curve equally on inner and outer sides of the curve fully on the outer side of the curve fully on the inner side of the curve one-fourth on inner side and three-fourth on outer side of the curve equally on inner and outer sides of the curve fully on the outer side of the curve fully on the inner side of the curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The recommended grade of tar for grouting purpose is RT-1 RT-5 RT-3 RT-2 RT-1 RT-5 RT-3 RT-2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Center and proceed to sides One side and proceed to other side Sides and proceed to center Any of the above Center and proceed to sides One side and proceed to other side Sides and proceed to center Any of the above ANSWER DOWNLOAD EXAMIANS APP