Highway Engineering Which of the following premix methods is used for base course ? mastic asphalt bituminous bound macadam bituminous carpet sheet asphalt mastic asphalt bituminous bound macadam bituminous carpet sheet asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Centre line markings are used in roadways meant for two way traffic to designate proper lateral placement of vehicles before turning to different directions to designate traffic lanes to indicate that overtaking is not permitted in roadways meant for two way traffic to designate proper lateral placement of vehicles before turning to different directions to designate traffic lanes to indicate that overtaking is not permitted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If an ascending gradient of 1 in 50 meets a descending gradient of 1 in 50, the length of summit curve for a stopping sight distance of 80 m will be zero 60m 80m 64m zero 60m 80m 64m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The critical combination of stresses for corner region in cement concrete roads is Load stress + frictional stress Load stress + warping stress Load stress + warping stress + frictional stress Load stress + warping stress frictional stress Load stress + frictional stress Load stress + warping stress Load stress + warping stress + frictional stress Load stress + warping stress frictional stress ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maxi¬mum capacity of a traffic lane at a speed of 10 m/sec is 1500 vehicles per hour 2500 vehicles per hour 3000 vehicles per hour 2000 vehicles per hour 1500 vehicles per hour 2500 vehicles per hour 3000 vehicles per hour 2000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The binder normally used in flexible pavement construction is lime cement bitumen None of these lime cement bitumen None of these ANSWER DOWNLOAD EXAMIANS APP