Highway Engineering Select the correct statement. All of these More the value of CBR, greater thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively More the value of group index, less thickness of pavement will be required All of these More the value of CBR, greater thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively More the value of group index, less thickness of pavement will be required ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ? sheet asphalt bituminous carpet bituminous concrete mastic asphalt sheet asphalt bituminous carpet bituminous concrete mastic asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 30m 60m 180m 120m 30m 60m 180m 120m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Study the following statements regarding creep. i) Creep is greater on curves than on tangent railway track, ii) Creep in new rails is more than that in old rails, iii) Creep is more on steep gradients than on level track. The correct answer is (i)and(ii) (ii) and (iii) only (i) (i), (ii) and (iii) (i)and(ii) (ii) and (iii) only (i) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Most suitable material for highway embankments is silts organic soil granular soil clays silts organic soil granular soil clays ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these ANSWER DOWNLOAD EXAMIANS APP