Highway Engineering
Select the correct statement.

More the value of CBR, greater thickness of pavement will be required
Minimum and maximum values of group index can be 0 and 20 respectively
All of these
More the value of group index, less thickness of pavement will be required

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
The direct interchange ramp involves

diverging to the left side and merging from left
diverging to the right side and merging from right
diverging to the right side and merging from left
diverging to the left side and merging from right

ANSWER DOWNLOAD EXAMIANS APP