Highway Engineering When the speed of traffic flow becomes zero,then traffic density becomes zero whereas traffic volume attains maximum value traffic density and traffic volume both become zero traffic density and traffic volume both attain maximum value traffic density attains maximum value whereas traffic volume becomes zero traffic density becomes zero whereas traffic volume attains maximum value traffic density and traffic volume both become zero traffic density and traffic volume both attain maximum value traffic density attains maximum value whereas traffic volume becomes zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 7.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 2.5 mm penetration only 7.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 2.5 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The method of design of flexible pavement as recommended by IRC is Westergaard method group index method Benkelman beam method CBR method Westergaard method group index method Benkelman beam method CBR method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 30 kmph 40 kmph 50 kmph 20 kmph 30 kmph 40 kmph 50 kmph 20 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The recommended grade of tar for grouting purpose is RT-2 RT-5 RT-3 RT-1 RT-2 RT-5 RT-3 RT-1 ANSWER DOWNLOAD EXAMIANS APP