Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be None of these greater than 40°C less-than 40°C equal to 40°C None of these greater than 40°C less-than 40°C equal to 40°C ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Stopping sight distance is always more than overtaking sight distance less than overtaking sight distance equal to overtaking sight distance None of these more than overtaking sight distance less than overtaking sight distance equal to overtaking sight distance None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.8 % 0.6 % 1.0 % 0.4 % 0.8 % 0.6 % 1.0 % 0.4 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the group index value of subgrade is between 5 and 9, then the subgrade is treated as fair poor good very poor fair poor good very poor ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Enoscope is used to find time-mean speed space-mean speed spot speed average speed time-mean speed space-mean speed spot speed average speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The value of ruling gradient in plains as per IRC recommendation is 1 m 15 1 in 30 1 in 12 1 in 20 1 m 15 1 in 30 1 in 12 1 in 20 ANSWER DOWNLOAD EXAMIANS APP