Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.8 % 0.4 % 0.6 % 1.0 % 0.8 % 0.4 % 0.6 % 1.0 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a horizontal curve if the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be more than the pressure on inner wheels equal to the pressure on inner wheels less than the pressure on inner wheels zero more than the pressure on inner wheels equal to the pressure on inner wheels less than the pressure on inner wheels zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be None of these less-than 40°C equal to 40°C greater than 40°C None of these less-than 40°C equal to 40°C greater than 40°C ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The recommended grade of tar for grouting purpose is RT-2 RT-3 RT-1 RT-5 RT-2 RT-3 RT-1 RT-5 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 30 1 in 48 1 in 60 1 in 36 1 in 30 1 in 48 1 in 60 1 in 36 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering As per IRC recommendations, the maximum limit of super elevation for mixed traffic in plain terrain is 1 in 12.5 1 in 15 1 in 10 equal to camber 1 in 12.5 1 in 15 1 in 10 equal to camber ANSWER DOWNLOAD EXAMIANS APP