Highway Engineering The binder normally used in flexible pavement construction is cement None of these lime bitumen cement None of these lime bitumen ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of shoulders in water bound macadam roads is equal to the cross slope of pavement zero less than the cross slope of pavement greater than the cross slope of pavement equal to the cross slope of pavement zero less than the cross slope of pavement greater than the cross slope of pavement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 12 cubic meter 10 cubic meter 8 cubic meter 15 cubic meter 12 cubic meter 10 cubic meter 8 cubic meter 15 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If aggregate impact value is 20 to 30 percent, then it is classified as exceptionally strong unsuitable for road surfacing strong satisfactory for road surfacing exceptionally strong unsuitable for road surfacing strong satisfactory for road surfacing ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 2.5 m 4.5 m 5.5m 3.5 m 2.5 m 4.5 m 5.5m 3.5 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering As per IRC recommendations, the average level of illumination on important roads carrying fast traffic is 20 lux 15 lux 30 lux 10 lux 20 lux 15 lux 30 lux 10 lux ANSWER DOWNLOAD EXAMIANS APP