Highway Engineering The binder normally used in flexible pavement construction is bitumen lime cement None of these bitumen lime cement None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum width of a vehicle as recommended by IRC is 3.81 m 1.85 m 2.44 m 4.72 m 3.81 m 1.85 m 2.44 m 4.72 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Percentage of free carbon in bitumen is None of these more than that in tar equal to that in tar less than that in tar None of these more than that in tar equal to that in tar less than that in tar ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1750/R 1700/R 1600/R 1850/R 1750/R 1700/R 1600/R 1850/R ANSWER DOWNLOAD EXAMIANS APP