Highway Engineering The binder normally used in flexible pavement construction is None of these bitumen lime cement None of these bitumen lime cement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum design gradient for vertical profile of a road is limiting gradient minimum gradient exceptional gradient ruling gradient limiting gradient minimum gradient exceptional gradient ruling gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a single lane road with two way traffic, the minimum stopping sight distance is equal to stopping distance three times the stopping distance half the stopping distance two times the stopping distance stopping distance three times the stopping distance half the stopping distance two times the stopping distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The background colour of the informatory sign board is white green yellow red white green yellow red ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 48 1 in 30 1 in 60 1 in 36 1 in 48 1 in 30 1 in 60 1 in 36 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP