Highway Engineering The binder normally used in flexible pavement construction is lime cement bitumen None of these lime cement bitumen None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 30 cm 20 cm 10 cm 50cm 30 cm 20 cm 10 cm 50cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is indicated by a warning sign ? overtaking prohibited no parking level crossing end of speed limit overtaking prohibited no parking level crossing end of speed limit ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of road should be approximately equal to three times the longitudinal gradient longitudinal gradient two times the longitudinal gradient half the longitudinal gradient three times the longitudinal gradient longitudinal gradient two times the longitudinal gradient half the longitudinal gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 5.5m 4.5 m 3.5 m 2.5 m 5.5m 4.5 m 3.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail ANSWER DOWNLOAD EXAMIANS APP