Highway Engineering The binder normally used in flexible pavement construction is bitumen None of these cement lime bitumen None of these cement lime ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 11 6 24 18 11 6 24 18 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as retaining wall breast wall parapet wall None of these retaining wall breast wall parapet wall None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In hill roads the side drains arc provided only on the opposite side of hill None of these on both sides of road only on the hill side of road only on the opposite side of hill None of these on both sides of road only on the hill side of road ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to two times the overtaking sight distance three times the overtaking sight distance overtaking sight distance five times the overtaking sight distance two times the overtaking sight distance three times the overtaking sight distance overtaking sight distance five times the overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from sides towards the centre lower edge towards the upper edge upper edge towards the lower edge centre towards the sides sides towards the centre lower edge towards the upper edge upper edge towards the lower edge centre towards the sides ANSWER DOWNLOAD EXAMIANS APP