Highway Engineering Compared to a level surface, on a descending gradient the stopping sight distance is less dependent on the speed same more less dependent on the speed same more ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The diagram which shows the approximate path of vehicles and pedestrians involved in accidents is known as collision diagram pie charts condition diagram spot maps collision diagram pie charts condition diagram spot maps ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 7.5 mm penetration only 5.0 mm penetration only 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 5.0 mm penetration only 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum number of vehicles beyond which the rotary may not function efficiently is 5000 vehicles per day 5000 vehicles per hour 500 vehicles per hour 500 vehicles per day 5000 vehicles per day 5000 vehicles per hour 500 vehicles per hour 500 vehicles per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The fundamental factor in the selection of pavement type is availability of funds for the construction project climatic condition type and intensity of traffic subgrade soil and drainage conditions availability of funds for the construction project climatic condition type and intensity of traffic subgrade soil and drainage conditions ANSWER DOWNLOAD EXAMIANS APP