Highway Engineering Compared to a level surface, on a descending gradient the stopping sight distance is more dependent on the speed same less more dependent on the speed same less ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 10 cubic meter 8 cubic meter 15 cubic meter 12 cubic meter 10 cubic meter 8 cubic meter 15 cubic meter 12 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The fundamental factor in the selection of pavement type is availability of funds for the construction project type and intensity of traffic climatic condition subgrade soil and drainage conditions availability of funds for the construction project type and intensity of traffic climatic condition subgrade soil and drainage conditions ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the design of super elevation for mixed traffic conditions, the speed is reduced by 20% 25% 75% 15% 20% 25% 75% 15% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Catch-water drain Sloping drain Cross drain Side drain Catch-water drain Sloping drain Cross drain Side drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Normally maximum cant permissible in Meter Gauge is 140 mm 75 mm 90 mm 165 mm 140 mm 75 mm 90 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP