Highway Engineering Compared to a level surface, on a descending gradient the stopping sight distance is less more same dependent on the speed less more same dependent on the speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The diagram which shows the approximate path of vehicles and pedestrians involved in accidents is known as pie charts spot maps collision diagram condition diagram pie charts spot maps collision diagram condition diagram ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from One side and proceed to other side Any of the above Center and proceed to sides Sides and proceed to center One side and proceed to other side Any of the above Center and proceed to sides Sides and proceed to center ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Cross drain Side drain Sloping drain Catch-water drain Cross drain Side drain Sloping drain Catch-water drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The attainment of super elevation by rotation of pavement about the inner edge of the pavement avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Centre line markings are used to designate proper lateral placement of vehicles before turning to different directions to indicate that overtaking is not permitted to designate traffic lanes in roadways meant for two way traffic to designate proper lateral placement of vehicles before turning to different directions to indicate that overtaking is not permitted to designate traffic lanes in roadways meant for two way traffic ANSWER DOWNLOAD EXAMIANS APP