Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Side drain Sloping drain Catch-water drain Cross drain Side drain Sloping drain Catch-water drain Cross drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is gasoline kerosene oil light diesel heavy diesel gasoline kerosene oil light diesel heavy diesel ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively All of these More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively All of these More the value of CBR, greater thickness of pavement will be required ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 1.0 % 0.4 % 0.8 % 0.6 % 1.0 % 0.4 % 0.8 % 0.6 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The most efficient traffic signal system is flexible progressive system alternate system simple progressive system simultaneous system flexible progressive system alternate system simple progressive system simultaneous system ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 12 cubic meter 15 cubic meter 8 cubic meter 10 cubic meter 12 cubic meter 15 cubic meter 8 cubic meter 10 cubic meter ANSWER DOWNLOAD EXAMIANS APP