Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Catch-water drain Side drain Sloping drain Cross drain Catch-water drain Side drain Sloping drain Cross drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the minimum spacing of vehicles decreases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed increases decreases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed increases ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of hill roads, the extra widening is generally provided fully on the inner side of the curve fully on the outer side of the curve equally on inner and outer sides of the curve one-fourth on inner side and three-fourth on outer side of the curve fully on the inner side of the curve fully on the outer side of the curve equally on inner and outer sides of the curve one-fourth on inner side and three-fourth on outer side of the curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The binder normally used in flexible pavement construction is lime cement bitumen None of these lime cement bitumen None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 40 kmph 30 kmph 20 kmph 50 kmph 40 kmph 30 kmph 20 kmph 50 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 2.5 m 3.5 m 5.5m 4.5 m 2.5 m 3.5 m 5.5m 4.5 m ANSWER DOWNLOAD EXAMIANS APP