Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Cross drain Catch-water drain Side drain Sloping drain Cross drain Catch-water drain Side drain Sloping drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Center and proceed to sides Sides and proceed to center Any of the above One side and proceed to other side Center and proceed to sides Sides and proceed to center Any of the above One side and proceed to other side ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Tie bars in cement concrete pavements are at expansion joints longitudinal joints warping joints contraction joints expansion joints longitudinal joints warping joints contraction joints ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 2000 tonnes per day 1000 tonnes per day 500 tonnes per day 1500 tonnes per day 2000 tonnes per day 1000 tonnes per day 500 tonnes per day 1500 tonnes per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering RC-2, MC-2 and SC-2 correspond to viscosity in increasing order from RC-2 to SC-2 same viscosity viscosity in decreasing order from RC-2 to SC-2 None of these viscosity in increasing order from RC-2 to SC-2 same viscosity viscosity in decreasing order from RC-2 to SC-2 None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following shapes is preferred in a valley curve ? lemniscate simple parabola cubic parabola spiral lemniscate simple parabola cubic parabola spiral ANSWER DOWNLOAD EXAMIANS APP