Highway Engineering Tie bars in cement concrete pavements are at contraction joints warping joints expansion joints longitudinal joints contraction joints warping joints expansion joints longitudinal joints ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 60 1 in 48 1 in 36 1 in 30 1 in 60 1 in 48 1 in 36 1 in 30 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If aggregate impact value is 20 to 30 percent, then it is classified as unsuitable for road surfacing satisfactory for road surfacing exceptionally strong strong unsuitable for road surfacing satisfactory for road surfacing exceptionally strong strong ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Stopping sight distance is always less than overtaking sight distance equal to overtaking sight distance more than overtaking sight distance None of these less than overtaking sight distance equal to overtaking sight distance more than overtaking sight distance None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Rigidity factor for a tyre pressure greater than 7 kg/cm² is less than 1 greater than 1 equal to 1 zero less than 1 greater than 1 equal to 1 zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane decreases increases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed decreases increases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed ANSWER DOWNLOAD EXAMIANS APP