Highway Engineering Percentage of free carbon in bitumen is equal to that in tar None of these more than that in tar less than that in tar equal to that in tar None of these more than that in tar less than that in tar ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a warning sign informatory sign regulatory sign None of these warning sign informatory sign regulatory sign None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Most suitable material for highway embankments is clays granular soil silts organic soil clays granular soil silts organic soil ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The thickness of bituminous carpet varies from 20 to 25 mm 100 to 120 mm 50 to 75 mm 75 to 100 mm 20 to 25 mm 100 to 120 mm 50 to 75 mm 75 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? return postcard method license plate method road side interview method home interview method return postcard method license plate method road side interview method home interview method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler ANSWER DOWNLOAD EXAMIANS APP