Highway Engineering “Dead Slow” is a informatory sign None of these warning sign regulatory sign informatory sign None of these warning sign regulatory sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of summit curves, the deviation angle will be maximum when an ascending gradient meets with a descending gradient a descending gradient meets with another descending gradient an ascending gradient meets with a level surface an ascending gradient meets with another ascending gradient an ascending gradient meets with a descending gradient a descending gradient meets with another descending gradient an ascending gradient meets with a level surface an ascending gradient meets with another ascending gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If ruling gradient is I in 20 and there is also a horizontal curve of radius 76 m, then the compensated grade should be 5 % 6% 4% 3 % 5 % 6% 4% 3 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 7.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 2.5 mm penetration only 7.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 2.5 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Highway facilities are designed for peak hourly volume of the year annual average hourly volume annual average daily traffic thirtieth highest hourly volume peak hourly volume of the year annual average hourly volume annual average daily traffic thirtieth highest hourly volume ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The absolute minimum radius of curve for safe operation for a speed of 110 kmph is 220 m 110 m 577 m 440 m 220 m 110 m 577 m 440 m ANSWER DOWNLOAD EXAMIANS APP