Highway Engineering “Dead Slow” is a warning sign informatory sign None of these regulatory sign warning sign informatory sign None of these regulatory sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The transition curve used in the horizontal alignment of highways as per IRC recommendations is spiral cubic parabola lemniscate Any of these spiral cubic parabola lemniscate Any of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The shoulder provided along the road edge should be smoother than the traffic lanes of same colour as that of the pavement of very low load bearing capacity rougher than the traffic lanes smoother than the traffic lanes of same colour as that of the pavement of very low load bearing capacity rougher than the traffic lanes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The recommended grade of tar for grouting purpose is RT-1 RT-5 RT-2 RT-3 RT-1 RT-5 RT-2 RT-3 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 36 1 in 60 1 in 48 1 in 30 1 in 36 1 in 60 1 in 48 1 in 30 ANSWER DOWNLOAD EXAMIANS APP