Highway Engineering “Dead Slow” is a None of these informatory sign regulatory sign warning sign None of these informatory sign regulatory sign warning sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The number of repetitions, which the pavement thickness designed for a given wheel load should be able to support during the life of pavement is 1000000 1000 10000 100000 1000000 1000 10000 100000 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Stopping sight distance is always None of these more than overtaking sight distance less than overtaking sight distance equal to overtaking sight distance None of these more than overtaking sight distance less than overtaking sight distance equal to overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The diagram which shows the approximate path of vehicles and pedestrians involved in accidents is known as pie charts spot maps condition diagram collision diagram pie charts spot maps condition diagram collision diagram ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to two times the overtaking sight distance five times the overtaking sight distance three times the overtaking sight distance overtaking sight distance two times the overtaking sight distance five times the overtaking sight distance three times the overtaking sight distance overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 3.8 (NV3)”2 3.8 NV”2 0.38 N V3/2 0.38 (NV3)”2 3.8 (NV3)”2 3.8 NV”2 0.38 N V3/2 0.38 (NV3)”2 ANSWER DOWNLOAD EXAMIANS APP