Highway Engineering “Dead Slow” is a regulatory sign None of these warning sign informatory sign regulatory sign None of these warning sign informatory sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The most efficient traffic signal system is alternate system flexible progressive system simple progressive system simultaneous system alternate system flexible progressive system simple progressive system simultaneous system ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Nagpur road plan formula were prepared by assuming radial or star and block road pattern radial or star and circular road pattern rectangular or block road pattern radial or star and grid road pattern radial or star and block road pattern radial or star and circular road pattern rectangular or block road pattern radial or star and grid road pattern ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 0.38 (NV3)”2 3.8 NV”2 0.38 N V3/2 3.8 (NV3)”2 0.38 (NV3)”2 3.8 NV”2 0.38 N V3/2 3.8 (NV3)”2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 2.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 2.5 mm penetration only 5.0 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 120m 60m 180m 30m 120m 60m 180m 30m ANSWER DOWNLOAD EXAMIANS APP