Highway Engineering The direct interchange ramp involves diverging to the right side and merging from right diverging to the left side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left diverging to the right side and merging from right diverging to the left side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as lane lines turn markings stop lines crosswalk lines lane lines turn markings stop lines crosswalk lines ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a informatory sign None of these warning sign regulatory sign informatory sign None of these warning sign regulatory sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The value of ruling gradient in plains as per IRC recommendation is 1 in 20 1 in 30 1 in 12 1 m 15 1 in 20 1 in 30 1 in 12 1 m 15 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 12 cubic meter 15 cubic meter 8 cubic meter 10 cubic meter 12 cubic meter 15 cubic meter 8 cubic meter 10 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? triangle turntable traverser scotch block triangle turntable traverser scotch block ANSWER DOWNLOAD EXAMIANS APP