Highway Engineering Flexible pavement distribute the wheel load None of these through structural action through a set of layers to the subgrade directly to subgrade None of these through structural action through a set of layers to the subgrade directly to subgrade ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 20 cm 50cm 10 cm 30 cm 20 cm 50cm 10 cm 30 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Stopping sight distance is always more than overtaking sight distance None of these equal to overtaking sight distance less than overtaking sight distance more than overtaking sight distance None of these equal to overtaking sight distance less than overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum number of vehicles can be parked with parallel parking 30° angle parking 90° angle parking 45° angle parking parallel parking 30° angle parking 90° angle parking 45° angle parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Vertical movement of rail Difference in level of two rails Longitudinal movement of rail Lateral movement of rail Vertical movement of rail Difference in level of two rails Longitudinal movement of rail Lateral movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from sides towards the centre lower edge towards the upper edge centre towards the sides upper edge towards the lower edge sides towards the centre lower edge towards the upper edge centre towards the sides upper edge towards the lower edge ANSWER DOWNLOAD EXAMIANS APP