Highway Engineering Desire lines are plotted in accident studies origin and destination studies speed studies traffic volume studies accident studies origin and destination studies speed studies traffic volume studies ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 1000 tonnes per day 500 tonnes per day 2000 tonnes per day 1500 tonnes per day 1000 tonnes per day 500 tonnes per day 2000 tonnes per day 1500 tonnes per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 2.5 m 4.5 m 3.5 m 5.5m 2.5 m 4.5 m 3.5 m 5.5m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 1.0 % 0.6 % 0.4 % 0.8 % 1.0 % 0.6 % 0.4 % 0.8 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 2.5 mm penetration only 7.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 2.5 mm penetration only 7.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as None of these retaining wall breast wall parapet wall None of these retaining wall breast wall parapet wall ANSWER DOWNLOAD EXAMIANS APP