Highway Engineering Desire lines are plotted in speed studies traffic volume studies origin and destination studies accident studies speed studies traffic volume studies origin and destination studies accident studies ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is None of these Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 7.5 mm penetration only 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 7.5 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The binder normally used in flexible pavement construction is cement lime None of these bitumen cement lime None of these bitumen ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the right side and merging from left diverging to the left side and merging from right diverging to the left side and merging from left diverging to the right side and merging from right diverging to the right side and merging from left diverging to the left side and merging from right diverging to the left side and merging from left diverging to the right side and merging from right ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The most efficient traffic signal system is simultaneous system simple progressive system alternate system flexible progressive system simultaneous system simple progressive system alternate system flexible progressive system ANSWER DOWNLOAD EXAMIANS APP