Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 30 kmph 40 kmph 50 kmph 20 kmph 30 kmph 40 kmph 50 kmph 20 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering RC-2, MC-2 and SC-2 correspond to viscosity in increasing order from RC-2 to SC-2 same viscosity None of these viscosity in decreasing order from RC-2 to SC-2 viscosity in increasing order from RC-2 to SC-2 same viscosity None of these viscosity in decreasing order from RC-2 to SC-2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The background colour of the informatory sign board is red white yellow green red white yellow green ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bottom most layer of pavement is known as subgrade wearing course sub-base course base course subgrade wearing course sub-base course base course ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The terrain may be classified as rolling terrain if the cross slope of land is between 10% and 25% upto 10% more than 60% between 25% and 60% between 10% and 25% upto 10% more than 60% between 25% and 60% ANSWER DOWNLOAD EXAMIANS APP