Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 30 kmph 20 kmph 50 kmph 40 kmph 30 kmph 20 kmph 50 kmph 40 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the speed of traffic flow becomes zero,then traffic density and traffic volume both become zero traffic density becomes zero whereas traffic volume attains maximum value traffic density and traffic volume both attain maximum value traffic density attains maximum value whereas traffic volume becomes zero traffic density and traffic volume both become zero traffic density becomes zero whereas traffic volume attains maximum value traffic density and traffic volume both attain maximum value traffic density attains maximum value whereas traffic volume becomes zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The critical combination of stresses for corner region in cement concrete roads is Load stress + warping stress frictional stress Load stress + frictional stress Load stress + warping stress + frictional stress Load stress + warping stress Load stress + warping stress frictional stress Load stress + frictional stress Load stress + warping stress + frictional stress Load stress + warping stress ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Length of a vehicle affects clearance to be provided under structures such as overbridges, under-bridges etc. extra width of pavement and minimum turning radius width of shoulders and parking facilities width of traffic lanes clearance to be provided under structures such as overbridges, under-bridges etc. extra width of pavement and minimum turning radius width of shoulders and parking facilities width of traffic lanes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Sides and proceed to center One side and proceed to other side Any of the above Center and proceed to sides Sides and proceed to center One side and proceed to other side Any of the above Center and proceed to sides ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted None of these ANSWER DOWNLOAD EXAMIANS APP