Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 40 kmph 50 kmph 30 kmph 20 kmph 40 kmph 50 kmph 30 kmph 20 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is kerosene oil gasoline light diesel heavy diesel kerosene oil gasoline light diesel heavy diesel ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Desire lines are plotted in accident studies traffic volume studies origin and destination studies speed studies accident studies traffic volume studies origin and destination studies speed studies ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) -0.168 cm 7.432 cm 0.168 cm 7.768 cm -0.168 cm 7.432 cm 0.168 cm 7.768 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane increases decreases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed increases decreases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 60 1 in 36 1 in 48 1 in 30 1 in 60 1 in 36 1 in 48 1 in 30 ANSWER DOWNLOAD EXAMIANS APP