Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 40 kmph 30 kmph 20 kmph 50 kmph 40 kmph 30 kmph 20 kmph 50 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted None of these Sprayed after the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 5.5m 3.5 m 2.5 m 4.5 m 5.5m 3.5 m 2.5 m 4.5 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Centre line markings are used to indicate that overtaking is not permitted to designate proper lateral placement of vehicles before turning to different directions in roadways meant for two way traffic to designate traffic lanes to indicate that overtaking is not permitted to designate proper lateral placement of vehicles before turning to different directions in roadways meant for two way traffic to designate traffic lanes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The terrain may be classified as rolling terrain if the cross slope of land is between 10% and 25% between 25% and 60% more than 60% upto 10% between 10% and 25% between 25% and 60% more than 60% upto 10% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The group index for a soil, whose liquid limit is 40 percent, plasticity index is 10 percent and percentage passing 75 micron IS sieve is 35, is 0 3 5 7 0 3 5 7 ANSWER DOWNLOAD EXAMIANS APP