Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 50 kmph 20 kmph 40 kmph 30 kmph 50 kmph 20 kmph 40 kmph 30 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The most suitable equipment for compacting clayey soils is a vibrator sheep foot roller pneumatic tyred roller smooth wheeled roller vibrator sheep foot roller pneumatic tyred roller smooth wheeled roller ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be less-than 40°C greater than 40°C equal to 40°C None of these less-than 40°C greater than 40°C equal to 40°C None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Los Angeles testing machine is used to conduct Attrition test Impact test Abrasion test Crushing strength test Attrition test Impact test Abrasion test Crushing strength test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 1500 tonnes per day 2000 tonnes per day 500 tonnes per day 1000 tonnes per day 1500 tonnes per day 2000 tonnes per day 500 tonnes per day 1000 tonnes per day ANSWER DOWNLOAD EXAMIANS APP