Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? return postcard method home interview method road side interview method license plate method return postcard method home interview method road side interview method license plate method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Cross drain Catch-water drain Sloping drain Side drain Cross drain Catch-water drain Sloping drain Side drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as retaining wall None of these parapet wall breast wall retaining wall None of these parapet wall breast wall ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The binder normally used in flexible pavement construction is lime bitumen cement None of these lime bitumen cement None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from sides towards the centre upper edge towards the lower edge lower edge towards the upper edge centre towards the sides sides towards the centre upper edge towards the lower edge lower edge towards the upper edge centre towards the sides ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Most suitable material for highway embankments is clays organic soil silts granular soil clays organic soil silts granular soil ANSWER DOWNLOAD EXAMIANS APP