Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? road side interview method home interview method license plate method return postcard method road side interview method home interview method license plate method return postcard method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is Spray of emulsion Prime coat Seal coat Tack coat Spray of emulsion Prime coat Seal coat Tack coat ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bottom most layer of pavement is known as sub-base course wearing course subgrade base course sub-base course wearing course subgrade base course ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1850/R 1600/R 1750/R 1700/R 1850/R 1600/R 1750/R 1700/R ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In hill roads the side drains arc provided only on the hill side of road None of these on both sides of road only on the opposite side of hill only on the hill side of road None of these on both sides of road only on the opposite side of hill ANSWER DOWNLOAD EXAMIANS APP