Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? return postcard method license plate method home interview method road side interview method return postcard method license plate method home interview method road side interview method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from lower edge towards the upper edge upper edge towards the lower edge centre towards the sides sides towards the centre lower edge towards the upper edge upper edge towards the lower edge centre towards the sides sides towards the centre ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum number of vehicles beyond which the rotary may not function efficiently is 500 vehicles per hour 5000 vehicles per hour 5000 vehicles per day 500 vehicles per day 500 vehicles per hour 5000 vehicles per hour 5000 vehicles per day 500 vehicles per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Nagpur road plan formula were prepared by assuming radial or star and block road pattern radial or star and grid road pattern rectangular or block road pattern radial or star and circular road pattern radial or star and block road pattern radial or star and grid road pattern rectangular or block road pattern radial or star and circular road pattern ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, wet rolling, application of screening and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, wet rolling, application of screening and application of filler dry rolling, application of filler, wet rolling and application of screening ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as retaining wall None of these breast wall parapet wall retaining wall None of these breast wall parapet wall ANSWER DOWNLOAD EXAMIANS APP