Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 18 11 6 24 18 11 6 24 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal both arms are horizontal None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is Prime coat Seal coat Tack coat Spray of emulsion Prime coat Seal coat Tack coat Spray of emulsion ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the group index value of subgrade is between 5 and 9, then the subgrade is treated as very poor fair poor good very poor fair poor good ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following premix methods is used for base course ? sheet asphalt bituminous bound macadam mastic asphalt bituminous carpet sheet asphalt bituminous bound macadam mastic asphalt bituminous carpet ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The number of repetitions, which the pavement thickness designed for a given wheel load should be able to support during the life of pavement is 1000 100000 1000000 10000 1000 100000 1000000 10000 ANSWER DOWNLOAD EXAMIANS APP