Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 6 11 18 24 6 11 18 24 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 36 1 in 60 1 in 30 1 in 48 1 in 36 1 in 60 1 in 30 1 in 48 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 10 cubic meter 12 cubic meter 15 cubic meter 8 cubic meter 10 cubic meter 12 cubic meter 15 cubic meter 8 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum number of vehicles can be parked with parallel parking 30° angle parking 90° angle parking 45° angle parking parallel parking 30° angle parking 90° angle parking 45° angle parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 0.38 (NV3)”2 0.38 N V3/2 3.8 (NV3)”2 3.8 NV”2 0.38 (NV3)”2 0.38 N V3/2 3.8 (NV3)”2 3.8 NV”2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening ANSWER DOWNLOAD EXAMIANS APP