Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 6 18 24 11 6 18 24 11 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Sloping drain Cross drain Catch-water drain Side drain Sloping drain Cross drain Catch-water drain Side drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum width of a vehicle as recommended by IRC is 3.81 m 2.44 m 4.72 m 1.85 m 3.81 m 2.44 m 4.72 m 1.85 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be None of these greater than 40°C less-than 40°C equal to 40°C None of these greater than 40°C less-than 40°C equal to 40°C ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Normally maximum cant permissible in Meter Gauge is 165 mm 75 mm 90 mm 140 mm 165 mm 75 mm 90 mm 140 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The most efficient traffic signal system is alternate system simultaneous system simple progressive system flexible progressive system alternate system simultaneous system simple progressive system flexible progressive system ANSWER DOWNLOAD EXAMIANS APP