Highway Engineering
For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm)

7.432 cm
7.768 cm
-0.168 cm
0.168 cm

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
The sequence of four stages of survey in a highway alignment is

map study, preliminary survey, reconnaissance and detailed survey
reconnaissance, map study, preliminary survey and detailed survey
preliminary survey, map study, reconnaissance and detailed survey
map study, reconnaissance, preliminary survey and detailed survey