Highway Engineering When a number of roads are meeting at a point and only one of the roads is important, then the suitable shape of rotary is tangent turbine circular elliptical tangent turbine circular elliptical ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Stopping sight distance is always equal to overtaking sight distance less than overtaking sight distance None of these more than overtaking sight distance equal to overtaking sight distance less than overtaking sight distance None of these more than overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Nagpur road plan formula were prepared by assuming radial or star and block road pattern radial or star and grid road pattern rectangular or block road pattern radial or star and circular road pattern radial or star and block road pattern radial or star and grid road pattern rectangular or block road pattern radial or star and circular road pattern ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Length of a vehicle affects clearance to be provided under structures such as overbridges, under-bridges etc. extra width of pavement and minimum turning radius width of shoulders and parking facilities width of traffic lanes clearance to be provided under structures such as overbridges, under-bridges etc. extra width of pavement and minimum turning radius width of shoulders and parking facilities width of traffic lanes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 0.38 (NV3)”2 3.8 (NV3)”2 0.38 N V3/2 3.8 NV”2 0.38 (NV3)”2 3.8 (NV3)”2 0.38 N V3/2 3.8 NV”2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.025 0.04 0.03 0.02 0.025 0.04 0.03 0.02 ANSWER DOWNLOAD EXAMIANS APP