Highway Engineering Which of the following represents hardest grade of bitumen ? 80/100 30/40 100/120 60/70 80/100 30/40 100/120 60/70 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a informatory sign warning sign None of these regulatory sign informatory sign warning sign None of these regulatory sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. More the value of CBR, greater thickness of pavement will be required All of these Minimum and maximum values of group index can be 0 and 20 respectively More the value of group index, less thickness of pavement will be required More the value of CBR, greater thickness of pavement will be required All of these Minimum and maximum values of group index can be 0 and 20 respectively More the value of group index, less thickness of pavement will be required ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Normally maximum cant permissible in Meter Gauge is 90 mm 140 mm 75 mm 165 mm 90 mm 140 mm 75 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from centre towards the sides lower edge towards the upper edge sides towards the centre upper edge towards the lower edge centre towards the sides lower edge towards the upper edge sides towards the centre upper edge towards the lower edge ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 10 cubic meter 15 cubic meter 8 cubic meter 12 cubic meter 10 cubic meter 15 cubic meter 8 cubic meter 12 cubic meter ANSWER DOWNLOAD EXAMIANS APP