Highway Engineering The suitable surfacing material for a bridge deck slab is sheet asphalt mastic asphalt bituminous carpet rolled asphalt sheet asphalt mastic asphalt bituminous carpet rolled asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of filler, wet rolling and application of screening ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Most suitable material for highway embankments is silts clays granular soil organic soil silts clays granular soil organic soil ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as retaining wall None of these breast wall parapet wall retaining wall None of these breast wall parapet wall ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 30 1 in 36 1 in 48 1 in 60 1 in 30 1 in 36 1 in 48 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is Seal coat Prime coat Tack coat Spray of emulsion Seal coat Prime coat Tack coat Spray of emulsion ANSWER DOWNLOAD EXAMIANS APP