Highway Engineering On a horizontal curve if the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be equal to the pressure on inner wheels less than the pressure on inner wheels more than the pressure on inner wheels zero equal to the pressure on inner wheels less than the pressure on inner wheels more than the pressure on inner wheels zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Tyre pressure influences the both the above total depth of pavement None of these quality of surface course both the above total depth of pavement None of these quality of surface course ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, application of filler and wet rolling dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, wet rolling and application of filler dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, wet rolling and application of filler dry rolling, wet rolling, application of screening and application of filler ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering A traffic rotary is justified where space is limited and costly when traffic volume is more than 5000 vehicles per hour when traffic volume is less than 500 vehicles per hour number of intersecting roads is between 4 and 7 space is limited and costly when traffic volume is more than 5000 vehicles per hour when traffic volume is less than 500 vehicles per hour number of intersecting roads is between 4 and 7 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. All of these More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively More the value of CBR, greater thickness of pavement will be required All of these More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively More the value of CBR, greater thickness of pavement will be required ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is known as design capacity ? practical capacity theoretical capacity possible capacity basic capacity practical capacity theoretical capacity possible capacity basic capacity ANSWER DOWNLOAD EXAMIANS APP