Highway Engineering Maximum daily traffic capacity of bituminous pavements is 2000 tonnes per day 500 tonnes per day 1000 tonnes per day 1500 tonnes per day 2000 tonnes per day 500 tonnes per day 1000 tonnes per day 1500 tonnes per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1750/R 1700/R 1600/R 1850/R 1750/R 1700/R 1600/R 1850/R ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the minimum spacing of vehicles increases first decreases and then increases after reaching a minimum value at optimum speed decreases first increases and then decreases after reaching a maximum value at optimum speed increases first decreases and then increases after reaching a minimum value at optimum speed decreases first increases and then decreases after reaching a maximum value at optimum speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The shoulder provided along the road edge should be of same colour as that of the pavement smoother than the traffic lanes of very low load bearing capacity rougher than the traffic lanes of same colour as that of the pavement smoother than the traffic lanes of very low load bearing capacity rougher than the traffic lanes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Number of cotters used in CST-9 sleepers is 5 4 3 2 5 4 3 2 ANSWER DOWNLOAD EXAMIANS APP