Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 mm its penetration value is 10 mm its penetration value is 8 to 10 mm its penetration value is 8 to 10 cm its penetration value is 8 mm its penetration value is 10 mm its penetration value is 8 to 10 mm its penetration value is 8 to 10 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the left side and merging from left diverging to the right side and merging from left diverging to the left side and merging from right diverging to the right side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left diverging to the left side and merging from right diverging to the right side and merging from right ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the width of car parking space and width of street are limited, generally preferred parking system is 45° angle parking 90° angle parking Parallel parking 65° angle parking 45° angle parking 90° angle parking Parallel parking 65° angle parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as lane lines turn markings stop lines crosswalk lines lane lines turn markings stop lines crosswalk lines ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 12 cubic meter 8 cubic meter 10 cubic meter 15 cubic meter 12 cubic meter 8 cubic meter 10 cubic meter 15 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is known as design capacity ? possible capacity theoretical capacity basic capacity practical capacity possible capacity theoretical capacity basic capacity practical capacity ANSWER DOWNLOAD EXAMIANS APP