Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 to 10 mm its penetration value is 8 mm its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 to 10 mm its penetration value is 8 mm its penetration value is 8 to 10 cm its penetration value is 10 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when semaphore arm lowered but warner arm horizontal None of these both arms are horizontal both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal None of these both arms are horizontal both semaphore and warner arms lowered ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Los Angeles testing machine is used to conduct Impact test Abrasion test Crushing strength test Attrition test Impact test Abrasion test Crushing strength test Attrition test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 48 1 in 60 1 in 30 1 in 36 1 in 48 1 in 60 1 in 30 1 in 36 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? return postcard method road side interview method license plate method home interview method return postcard method road side interview method license plate method home interview method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Any of the above Sides and proceed to center Center and proceed to sides One side and proceed to other side Any of the above Sides and proceed to center Center and proceed to sides One side and proceed to other side ANSWER DOWNLOAD EXAMIANS APP