Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 to 10 cm its penetration value is 8 to 10 mm its penetration value is 10 mm its penetration value is 8 mm its penetration value is 8 to 10 cm its penetration value is 8 to 10 mm its penetration value is 10 mm its penetration value is 8 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 60m 180m 120m 30m 60m 180m 120m 30m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The thickness of bituminous carpet varies from 50 to 75 mm 100 to 120 mm 20 to 25 mm 75 to 100 mm 50 to 75 mm 100 to 120 mm 20 to 25 mm 75 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The stopping sight distance depends upon efficiency of brakes speed of vehicle All of these total reaction time of driver efficiency of brakes speed of vehicle All of these total reaction time of driver ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane increases decreases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed increases decreases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed ANSWER DOWNLOAD EXAMIANS APP