Highway Engineering In the penetration macadam construction, the bitumen is None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the average center to center spacing of vehicles is 20 meters, then the basic capacity of a traffic lane at a speed of 50 kmph is 2500 vehicles per day 1000 vehicles per hour 2000 vehicles per hour 2500 vehicles per hour 2500 vehicles per day 1000 vehicles per hour 2000 vehicles per hour 2500 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Rigidity factor for a tyre pressure greater than 7 kg/cm² is equal to 1 less than 1 zero greater than 1 equal to 1 less than 1 zero greater than 1 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when semaphore arm lowered but warner arm horizontal both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal both arms are horizontal None of these both semaphore and warner arms lowered ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The thickness of bituminous carpet varies from 20 to 25 mm 50 to 75 mm 100 to 120 mm 75 to 100 mm 20 to 25 mm 50 to 75 mm 100 to 120 mm 75 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Compared to a level surface, on a descending gradient the stopping sight distance is more less dependent on the speed same more less dependent on the speed same ANSWER DOWNLOAD EXAMIANS APP