Highway Engineering In the penetration macadam construction, the bitumen is Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If ruling gradient is I in 20 and there is also a horizontal curve of radius 76 m, then the compensated grade should be 5 % 6% 3 % 4% 5 % 6% 3 % 4% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The percentage compensation in gradient for ruling gradient of 4% and horizontal curve of radius 760 m is 10% 1 % no compensation 0.1 % 10% 1 % no compensation 0.1 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering A traffic rotary is justified where number of intersecting roads is between 4 and 7 when traffic volume is less than 500 vehicles per hour space is limited and costly when traffic volume is more than 5000 vehicles per hour number of intersecting roads is between 4 and 7 when traffic volume is less than 500 vehicles per hour space is limited and costly when traffic volume is more than 5000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum allowable Los Angeles abrasion value for high quality surface course is 0.2 0.3 0.45 0.1 0.2 0.3 0.45 0.1 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ? bituminous concrete sheet asphalt bituminous carpet mastic asphalt bituminous concrete sheet asphalt bituminous carpet mastic asphalt ANSWER DOWNLOAD EXAMIANS APP