Highway Engineering In the penetration macadam construction, the bitumen is None of these Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The entrance and exit curves of a rotary have equal radii and equal widths of pavement equal radii but pavement width is more at entrance than at exit curve equal pavement widths but radius is more at entrance curve than at exit curve different radii and different widths of pavement equal radii and equal widths of pavement equal radii but pavement width is more at entrance than at exit curve equal pavement widths but radius is more at entrance curve than at exit curve different radii and different widths of pavement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? license plate method road side interview method home interview method return postcard method license plate method road side interview method home interview method return postcard method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum width of a vehicle as recommended by IRC is 3.81 m 1.85 m 4.72 m 2.44 m 3.81 m 1.85 m 4.72 m 2.44 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.02 0.025 0.04 0.03 0.02 0.025 0.04 0.03 ANSWER DOWNLOAD EXAMIANS APP