Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted None of these Sprayed after the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the average center to center spacing of vehicles is 20 meters, then the basic capacity of a traffic lane at a speed of 50 kmph is 2000 vehicles per hour 2500 vehicles per hour 2500 vehicles per day 1000 vehicles per hour 2000 vehicles per hour 2500 vehicles per hour 2500 vehicles per day 1000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 60 1 in 30 1 in 36 1 in 48 1 in 60 1 in 30 1 in 36 1 in 48 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is indicated by a warning sign ? level crossing no parking end of speed limit overtaking prohibited level crossing no parking end of speed limit overtaking prohibited ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Percentage of free carbon in bitumen is equal to that in tar None of these more than that in tar less than that in tar equal to that in tar None of these more than that in tar less than that in tar ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maxi¬mum capacity of a traffic lane at a speed of 10 m/sec is 1500 vehicles per hour 3000 vehicles per hour 2000 vehicles per hour 2500 vehicles per hour 1500 vehicles per hour 3000 vehicles per hour 2000 vehicles per hour 2500 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP