Highway Engineering In the penetration macadam construction, the bitumen is Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is indicated by a warning sign ? no parking end of speed limit level crossing overtaking prohibited no parking end of speed limit level crossing overtaking prohibited ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The rail is designated by its weight length cross-section weight per unit length weight length cross-section weight per unit length ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum design gradient for vertical profile of a road is limiting gradient minimum gradient exceptional gradient ruling gradient limiting gradient minimum gradient exceptional gradient ruling gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The method of design of flexible pavement as recommended by IRC is Westergaard method group index method Benkelman beam method CBR method Westergaard method group index method Benkelman beam method CBR method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be less-than 40°C equal to 40°C greater than 40°C None of these less-than 40°C equal to 40°C greater than 40°C None of these ANSWER DOWNLOAD EXAMIANS APP