Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Reaction time of a driver is same for all speeds increases with increase in speed decreases with increase in speed None of these is same for all speeds increases with increase in speed decreases with increase in speed None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering As per IRC recommendations, the average level of illumination on important roads carrying fast traffic is 15 lux 20 lux 10 lux 30 lux 15 lux 20 lux 10 lux 30 lux ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) -0.168 cm 7.432 cm 0.168 cm 7.768 cm -0.168 cm 7.432 cm 0.168 cm 7.768 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Center and proceed to sides One side and proceed to other side Any of the above Sides and proceed to center Center and proceed to sides One side and proceed to other side Any of the above Sides and proceed to center ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Normally maximum cant permissible in Meter Gauge is 140 mm 90 mm 165 mm 75 mm 140 mm 90 mm 165 mm 75 mm ANSWER DOWNLOAD EXAMIANS APP