In the penetration macadam construction, the bitumen is

Premixed with aggregates and then spread
Sprayed before the aggregates are spread and compacted
None of these
Sprayed after the aggregates are spread and compacted

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
With increase in speed of the traffic stream, the maximum capacity of the lane

first decreases and then increases after reaching a minimum value at optimum speed
increases
first increases and then decreases after reaching a maximum value at optimum speed
decreases

ANSWER DOWNLOAD EXAMIANS APP