Highway Engineering Maximum number of vehicles can be parked with 90° angle parking parallel parking 45° angle parking 30° angle parking 90° angle parking parallel parking 45° angle parking 30° angle parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ? bituminous concrete bituminous carpet mastic asphalt sheet asphalt bituminous concrete bituminous carpet mastic asphalt sheet asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bitumen of grade 80/100 means its penetration value is 10 mm its penetration value is 8 mm its penetration value is 8 to 10 mm its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 mm its penetration value is 8 to 10 mm its penetration value is 8 to 10 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following shapes is preferred in a valley curve ? lemniscate cubic parabola simple parabola spiral lemniscate cubic parabola simple parabola spiral ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Difference in level of two rails Vertical movement of rail Longitudinal movement of rail Lateral movement of rail Difference in level of two rails Vertical movement of rail Longitudinal movement of rail Lateral movement of rail ANSWER DOWNLOAD EXAMIANS APP