Highway Engineering A traffic rotary is justified where space is limited and costly number of intersecting roads is between 4 and 7 when traffic volume is less than 500 vehicles per hour when traffic volume is more than 5000 vehicles per hour space is limited and costly number of intersecting roads is between 4 and 7 when traffic volume is less than 500 vehicles per hour when traffic volume is more than 5000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Difference in level of two rails Lateral movement of rail Vertical movement of rail Longitudinal movement of rail Difference in level of two rails Lateral movement of rail Vertical movement of rail Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If an ascending gradient of 1 in 50 meets a descending gradient of 1 in 50, the length of summit curve for a stopping sight distance of 80 m will be 80m 60m 64m zero 80m 60m 64m zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Catch-water drain Side drain Sloping drain Cross drain Catch-water drain Side drain Sloping drain Cross drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed increases decreases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed increases decreases ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When two equally important roads cross roughly at right angles, the suitable shape of central island is elliptical circular turbine tangent elliptical circular turbine tangent ANSWER DOWNLOAD EXAMIANS APP