Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to five times the overtaking sight distance three times the overtaking sight distance two times the overtaking sight distance overtaking sight distance five times the overtaking sight distance three times the overtaking sight distance two times the overtaking sight distance overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Equivalent factor of passenger car unit (PCU) for a passenger car as per IRC is 0.5 1.0 10 2.0 0.5 1.0 10 2.0 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Reaction time of a driver None of these decreases with increase in speed is same for all speeds increases with increase in speed None of these decreases with increase in speed is same for all speeds increases with increase in speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maxi¬mum capacity of a traffic lane at a speed of 10 m/sec is 1500 vehicles per hour 2000 vehicles per hour 2500 vehicles per hour 3000 vehicles per hour 1500 vehicles per hour 2000 vehicles per hour 2500 vehicles per hour 3000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) -0.168 cm 0.168 cm 7.768 cm 7.432 cm -0.168 cm 0.168 cm 7.768 cm 7.432 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Highway facilities are designed for peak hourly volume of the year annual average daily traffic thirtieth highest hourly volume annual average hourly volume peak hourly volume of the year annual average daily traffic thirtieth highest hourly volume annual average hourly volume ANSWER DOWNLOAD EXAMIANS APP