Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to three times the overtaking sight distance five times the overtaking sight distance two times the overtaking sight distance overtaking sight distance three times the overtaking sight distance five times the overtaking sight distance two times the overtaking sight distance overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from upper edge towards the lower edge centre towards the sides lower edge towards the upper edge sides towards the centre upper edge towards the lower edge centre towards the sides lower edge towards the upper edge sides towards the centre ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The absolute minimum radius of curve for safe operation for a speed of 110 kmph is 220 m 577 m 440 m 110 m 220 m 577 m 440 m 110 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Normally maximum cant permissible in Meter Gauge is 75 mm 165 mm 140 mm 90 mm 75 mm 165 mm 140 mm 90 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Center and proceed to sides Sides and proceed to center Any of the above One side and proceed to other side Center and proceed to sides Sides and proceed to center Any of the above One side and proceed to other side ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The rail is designated by its weight per unit length length cross-section weight weight per unit length length cross-section weight ANSWER DOWNLOAD EXAMIANS APP