Highway Engineering The maximum number of vehicles beyond which the rotary may not function efficiently is 500 vehicles per day 500 vehicles per hour 5000 vehicles per hour 5000 vehicles per day 500 vehicles per day 500 vehicles per hour 5000 vehicles per hour 5000 vehicles per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Length of a vehicle affects clearance to be provided under structures such as overbridges, under-bridges etc. extra width of pavement and minimum turning radius width of traffic lanes width of shoulders and parking facilities clearance to be provided under structures such as overbridges, under-bridges etc. extra width of pavement and minimum turning radius width of traffic lanes width of shoulders and parking facilities ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 7.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 2.5 mm penetration only 7.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 2.5 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 6 11 24 18 6 11 24 18 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a None of these regulatory sign informatory sign warning sign None of these regulatory sign informatory sign warning sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of shoulders in water bound macadam roads is greater than the cross slope of pavement equal to the cross slope of pavement less than the cross slope of pavement zero greater than the cross slope of pavement equal to the cross slope of pavement less than the cross slope of pavement zero ANSWER DOWNLOAD EXAMIANS APP