Highway Engineering The maximum number of vehicles beyond which the rotary may not function efficiently is 5000 vehicles per hour 500 vehicles per hour 5000 vehicles per day 500 vehicles per day 5000 vehicles per hour 500 vehicles per hour 5000 vehicles per day 500 vehicles per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the width of car parking space and width of street are limited, generally preferred parking system is 65° angle parking Parallel parking 90° angle parking 45° angle parking 65° angle parking Parallel parking 90° angle parking 45° angle parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when semaphore arm lowered but warner arm horizontal both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal both arms are horizontal None of these both semaphore and warner arms lowered ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? home interview method road side interview method license plate method return postcard method home interview method road side interview method license plate method return postcard method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.8 % 1.0 % 0.4 % 0.6 % 0.8 % 1.0 % 0.4 % 0.6 % ANSWER DOWNLOAD EXAMIANS APP