Highway Engineering Which of the following is indicated by a warning sign ? level crossing end of speed limit no parking overtaking prohibited level crossing end of speed limit no parking overtaking prohibited ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 30 1 in 48 1 in 36 1 in 60 1 in 30 1 in 48 1 in 36 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bottom most layer of pavement is known as base course wearing course subgrade sub-base course base course wearing course subgrade sub-base course ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of shoulders in water bound macadam roads is greater than the cross slope of pavement zero less than the cross slope of pavement equal to the cross slope of pavement greater than the cross slope of pavement zero less than the cross slope of pavement equal to the cross slope of pavement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The number of repetitions, which the pavement thickness designed for a given wheel load should be able to support during the life of pavement is 100000 10000 1000 1000000 100000 10000 1000 1000000 ANSWER DOWNLOAD EXAMIANS APP