Highway Engineering The entrance and exit curves of a rotary have different radii and different widths of pavement equal radii and equal widths of pavement equal radii but pavement width is more at entrance than at exit curve equal pavement widths but radius is more at entrance curve than at exit curve different radii and different widths of pavement equal radii and equal widths of pavement equal radii but pavement width is more at entrance than at exit curve equal pavement widths but radius is more at entrance curve than at exit curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is known as design capacity ? basic capacity possible capacity theoretical capacity practical capacity basic capacity possible capacity theoretical capacity practical capacity ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is considered to be the highest quality construction in the group of black top pavements? Bituminous concrete Mastic asphalt Bituminous carpet Sheet asphalt Bituminous concrete Mastic asphalt Bituminous carpet Sheet asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 0.38 (NV3)”2 0.38 N V3/2 3.8 (NV3)”2 3.8 NV”2 0.38 (NV3)”2 0.38 N V3/2 3.8 (NV3)”2 3.8 NV”2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be less-than 40°C greater than 40°C equal to 40°C None of these less-than 40°C greater than 40°C equal to 40°C None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 120m 180m 30m 60m 120m 180m 30m 60m ANSWER DOWNLOAD EXAMIANS APP