Highway Engineering The background colour of the informatory sign board is yellow green white red yellow green white red ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 2000 tonnes per day 1000 tonnes per day 500 tonnes per day 1500 tonnes per day 2000 tonnes per day 1000 tonnes per day 500 tonnes per day 1500 tonnes per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed decreases increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed decreases ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1850/R 1750/R 1700/R 1600/R 1850/R 1750/R 1700/R 1600/R ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The thickness of bituminous carpet varies from 20 to 25 mm 100 to 120 mm 75 to 100 mm 50 to 75 mm 20 to 25 mm 100 to 120 mm 75 to 100 mm 50 to 75 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. More the value of CBR, greater thickness of pavement will be required All of these Minimum and maximum values of group index can be 0 and 20 respectively More the value of group index, less thickness of pavement will be required More the value of CBR, greater thickness of pavement will be required All of these Minimum and maximum values of group index can be 0 and 20 respectively More the value of group index, less thickness of pavement will be required ANSWER DOWNLOAD EXAMIANS APP