Highway Engineering The background colour of the informatory sign board is white green yellow red white green yellow red ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the speed of traffic flow becomes zero,then traffic density and traffic volume both become zero traffic density and traffic volume both attain maximum value traffic density attains maximum value whereas traffic volume becomes zero traffic density becomes zero whereas traffic volume attains maximum value traffic density and traffic volume both become zero traffic density and traffic volume both attain maximum value traffic density attains maximum value whereas traffic volume becomes zero traffic density becomes zero whereas traffic volume attains maximum value ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 0.38 N V3/2 3.8 NV”2 0.38 (NV3)”2 3.8 (NV3)”2 0.38 N V3/2 3.8 NV”2 0.38 (NV3)”2 3.8 (NV3)”2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 20 cm 50cm 10 cm 30 cm 20 cm 50cm 10 cm 30 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Vertical movement of rail Lateral movement of rail Longitudinal movement of rail Difference in level of two rails Vertical movement of rail Lateral movement of rail Longitudinal movement of rail Difference in level of two rails ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Sides and proceed to center Any of the above Center and proceed to sides One side and proceed to other side Sides and proceed to center Any of the above Center and proceed to sides One side and proceed to other side ANSWER DOWNLOAD EXAMIANS APP