Highway Engineering When two equally important roads cross roughly at right angles, the suitable shape of central island is circular elliptical turbine tangent circular elliptical turbine tangent ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 60 1 in 48 1 in 30 1 in 36 1 in 60 1 in 48 1 in 30 1 in 36 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Desire lines are plotted in origin and destination studies speed studies accident studies traffic volume studies origin and destination studies speed studies accident studies traffic volume studies ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of summit curves, the deviation angle will be maximum when an ascending gradient meets with another ascending gradient a descending gradient meets with another descending gradient an ascending gradient meets with a level surface an ascending gradient meets with a descending gradient an ascending gradient meets with another ascending gradient a descending gradient meets with another descending gradient an ascending gradient meets with a level surface an ascending gradient meets with a descending gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If b is the wheel track of a vehicle and h is the height of centre of gravity above road surface, then to avoid overturning and lateral skidding on a horizontal curve, the centrifugal ratio should always be greater than b/2h and also greater than coefficient of lateral friction less than b/2h and also less than co-efficient of lateral friction less than b/2h and greater than co-efficient of lateral friction greater than b/2h and less than co-efficient of lateral friction greater than b/2h and also greater than coefficient of lateral friction less than b/2h and also less than co-efficient of lateral friction less than b/2h and greater than co-efficient of lateral friction greater than b/2h and less than co-efficient of lateral friction ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Camber in the road is provided for having proper sight distance counteracting the centrifugal force effective drainage None of these having proper sight distance counteracting the centrifugal force effective drainage None of these ANSWER DOWNLOAD EXAMIANS APP