Highway Engineering When two equally important roads cross roughly at right angles, the suitable shape of central island is elliptical tangent turbine circular elliptical tangent turbine circular ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For highway geometric design purposes the speed used is 15th percentile 98 “”percentile 50 “”percentile 85th percentile 15th percentile 98 “”percentile 50 “”percentile 85th percentile ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 15 cubic meter 10 cubic meter 12 cubic meter 8 cubic meter 15 cubic meter 10 cubic meter 12 cubic meter 8 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is Seal coat Spray of emulsion Prime coat Tack coat Seal coat Spray of emulsion Prime coat Tack coat ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 40 kmph 30 kmph 20 kmph 50 kmph 40 kmph 30 kmph 20 kmph 50 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling ANSWER DOWNLOAD EXAMIANS APP