Highway Engineering Los Angeles testing machine is used to conduct Crushing strength test Impact test Abrasion test Attrition test Crushing strength test Impact test Abrasion test Attrition test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as retaining wall parapet wall breast wall None of these retaining wall parapet wall breast wall None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The attainment of super elevation by rotation of pavement about the inner edge of the pavement avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Sloping drain Catch-water drain Cross drain Side drain Sloping drain Catch-water drain Cross drain Side drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The stopping sight distance depends upon total reaction time of driver All of these speed of vehicle efficiency of brakes total reaction time of driver All of these speed of vehicle efficiency of brakes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The provision of traffic signals at intersections increases right angled and rear end collisions reduces right angled collisions but may increase rear end collisions reduces right angled and rear end collisions reduces rear end collisions but may increase right angled collisions increases right angled and rear end collisions reduces right angled collisions but may increase rear end collisions reduces right angled and rear end collisions reduces rear end collisions but may increase right angled collisions ANSWER DOWNLOAD EXAMIANS APP