Highway Engineering Los Angeles testing machine is used to conduct Crushing strength test Attrition test Impact test Abrasion test Crushing strength test Attrition test Impact test Abrasion test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is None of these Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maxi¬mum capacity of a traffic lane at a speed of 10 m/sec is 2000 vehicles per hour 1500 vehicles per hour 2500 vehicles per hour 3000 vehicles per hour 2000 vehicles per hour 1500 vehicles per hour 2500 vehicles per hour 3000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Centre line markings are used to designate proper lateral placement of vehicles before turning to different directions in roadways meant for two way traffic to indicate that overtaking is not permitted to designate traffic lanes to designate proper lateral placement of vehicles before turning to different directions in roadways meant for two way traffic to indicate that overtaking is not permitted to designate traffic lanes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a informatory sign None of these warning sign regulatory sign informatory sign None of these warning sign regulatory sign ANSWER DOWNLOAD EXAMIANS APP