Highway Engineering If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maxi¬mum capacity of a traffic lane at a speed of 10 m/sec is 2000 vehicles per hour 3000 vehicles per hour 1500 vehicles per hour 2500 vehicles per hour 2000 vehicles per hour 3000 vehicles per hour 1500 vehicles per hour 2500 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as parapet wall None of these breast wall retaining wall parapet wall None of these breast wall retaining wall ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the width of car parking space and width of street are limited, generally preferred parking system is Parallel parking 65° angle parking 45° angle parking 90° angle parking Parallel parking 65° angle parking 45° angle parking 90° angle parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.4 % 0.6 % 1.0 % 0.8 % 0.4 % 0.6 % 1.0 % 0.8 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The percentage compensation in gradient for ruling gradient of 4% and horizontal curve of radius 760 m is 1 % 10% no compensation 0.1 % 1 % 10% no compensation 0.1 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Nagpur road plan formula were prepared by assuming radial or star and grid road pattern radial or star and block road pattern rectangular or block road pattern radial or star and circular road pattern radial or star and grid road pattern radial or star and block road pattern rectangular or block road pattern radial or star and circular road pattern ANSWER DOWNLOAD EXAMIANS APP