Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 30 1 in 36 1 in 48 1 in 60 1 in 30 1 in 36 1 in 48 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Camber in the road is provided for None of these having proper sight distance counteracting the centrifugal force effective drainage None of these having proper sight distance counteracting the centrifugal force effective drainage ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 1.0 % 0.4 % 0.6 % 0.8 % 1.0 % 0.4 % 0.6 % 0.8 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is indicated by a warning sign ? end of speed limit overtaking prohibited no parking level crossing end of speed limit overtaking prohibited no parking level crossing ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is heavy diesel gasoline light diesel kerosene oil heavy diesel gasoline light diesel kerosene oil ANSWER DOWNLOAD EXAMIANS APP