Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 36 1 in 48 1 in 60 1 in 30 1 in 36 1 in 48 1 in 60 1 in 30 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 120m 180m 60m 30m 120m 180m 60m 30m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the path travelled along the road surface is more than the circumferential movement of the wheels due to rotation, then it results in slipping turning skidding revolving slipping turning skidding revolving ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The binder normally used in flexible pavement construction is cement bitumen None of these lime cement bitumen None of these lime ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey ANSWER DOWNLOAD EXAMIANS APP