Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 48 1 in 30 1 in 60 1 in 36 1 in 48 1 in 30 1 in 60 1 in 36 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The transition curve used in the horizontal alignment of highways as per IRC recommendations is Any of these cubic parabola lemniscate spiral Any of these cubic parabola lemniscate spiral ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The critical combination of stresses for corner region in cement concrete roads is Load stress + frictional stress Load stress + warping stress frictional stress Load stress + warping stress + frictional stress Load stress + warping stress Load stress + frictional stress Load stress + warping stress frictional stress Load stress + warping stress + frictional stress Load stress + warping stress ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 5.5m 4.5 m 3.5 m 2.5 m 5.5m 4.5 m 3.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from One side and proceed to other side Center and proceed to sides Any of the above Sides and proceed to center One side and proceed to other side Center and proceed to sides Any of the above Sides and proceed to center ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of summit curves, the deviation angle will be maximum when a descending gradient meets with another descending gradient an ascending gradient meets with a descending gradient an ascending gradient meets with another ascending gradient an ascending gradient meets with a level surface a descending gradient meets with another descending gradient an ascending gradient meets with a descending gradient an ascending gradient meets with another ascending gradient an ascending gradient meets with a level surface ANSWER DOWNLOAD EXAMIANS APP