Highway Engineering Normally maximum cant permissible in Meter Gauge is 165 mm 90 mm 75 mm 140 mm 165 mm 90 mm 75 mm 140 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Sloping drain Catch-water drain Cross drain Side drain Sloping drain Catch-water drain Cross drain Side drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The method of design of flexible pavement as recommended by IRC is Benkelman beam method CBR method group index method Westergaard method Benkelman beam method CBR method group index method Westergaard method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering A traffic rotary is justified where number of intersecting roads is between 4 and 7 when traffic volume is more than 5000 vehicles per hour space is limited and costly when traffic volume is less than 500 vehicles per hour number of intersecting roads is between 4 and 7 when traffic volume is more than 5000 vehicles per hour space is limited and costly when traffic volume is less than 500 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The background colour of the informatory sign board is red yellow white green red yellow white green ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. Minimum and maximum values of group index can be 0 and 20 respectively More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required All of these Minimum and maximum values of group index can be 0 and 20 respectively More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required All of these ANSWER DOWNLOAD EXAMIANS APP