Highway Engineering Normally maximum cant permissible in Meter Gauge is 165 mm 140 mm 90 mm 75 mm 165 mm 140 mm 90 mm 75 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 24 6 11 18 24 6 11 18 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Number of cotters used in CST-9 sleepers is 3 2 4 5 3 2 4 5 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is indicated by a warning sign ? level crossing no parking overtaking prohibited end of speed limit level crossing no parking overtaking prohibited end of speed limit ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Premixed with aggregates and then spread None of these Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted Premixed with aggregates and then spread None of these Sprayed before the aggregates are spread and compacted Sprayed after the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For design, that length of transition curve should be taken which is smaller of (A) and (B) higher of (A) and (B) based on rate of change of super elevation based on allowable rate of change of centrifugal acceleration smaller of (A) and (B) higher of (A) and (B) based on rate of change of super elevation based on allowable rate of change of centrifugal acceleration ANSWER DOWNLOAD EXAMIANS APP