Highway Engineering The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as stop lines lane lines turn markings crosswalk lines stop lines lane lines turn markings crosswalk lines ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed decreases increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed decreases increases ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The most suitable equipment for compacting clayey soils is a smooth wheeled roller sheep foot roller vibrator pneumatic tyred roller smooth wheeled roller sheep foot roller vibrator pneumatic tyred roller ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If aggregate impact value is 20 to 30 percent, then it is classified as unsuitable for road surfacing strong exceptionally strong satisfactory for road surfacing unsuitable for road surfacing strong exceptionally strong satisfactory for road surfacing ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The attainment of super elevation by rotation of pavement about the inner edge of the pavement is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork avoids the drainage problem in flat terrain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. Minimum and maximum values of group index can be 0 and 20 respectively All of these More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively All of these More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required ANSWER DOWNLOAD EXAMIANS APP