Highway Engineering The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as turn markings stop lines lane lines crosswalk lines turn markings stop lines lane lines crosswalk lines ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum number of vehicles can be parked with parallel parking 45° angle parking 30° angle parking 90° angle parking parallel parking 45° angle parking 30° angle parking 90° angle parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Center and proceed to sides Any of the above One side and proceed to other side Sides and proceed to center Center and proceed to sides Any of the above One side and proceed to other side Sides and proceed to center ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If aggregate impact value is 20 to 30 percent, then it is classified as strong unsuitable for road surfacing exceptionally strong satisfactory for road surfacing strong unsuitable for road surfacing exceptionally strong satisfactory for road surfacing ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The background colour of the informatory sign board is white red green yellow white red green yellow ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Difference in level of two rails Vertical movement of rail Lateral movement of rail Longitudinal movement of rail Difference in level of two rails Vertical movement of rail Lateral movement of rail Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP