Highway Engineering The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as turn markings stop lines crosswalk lines lane lines turn markings stop lines crosswalk lines lane lines ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is kerosene oil gasoline heavy diesel light diesel kerosene oil gasoline heavy diesel light diesel ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Study the following statements regarding creep. i) Creep is greater on curves than on tangent railway track, ii) Creep in new rails is more than that in old rails, iii) Creep is more on steep gradients than on level track. The correct answer is only (i) (i), (ii) and (iii) (i)and(ii) (ii) and (iii) only (i) (i), (ii) and (iii) (i)and(ii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The terrain may be classified as rolling terrain if the cross slope of land is between 10% and 25% more than 60% between 25% and 60% upto 10% between 10% and 25% more than 60% between 25% and 60% upto 10% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 1.0 % 0.6 % 0.4 % 0.8 % 1.0 % 0.6 % 0.4 % 0.8 % ANSWER DOWNLOAD EXAMIANS APP