Highway Engineering The sequence of four stages of survey in a highway alignment is map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a constant value of coefficient of lateral friction, the value of required super-elevation increases with increase in both speed and radius of curve decrease in speed and with increase in radius of curve increase in speed and with decrease in radius of curve decrease in both speed and radius of curve increase in both speed and radius of curve decrease in speed and with increase in radius of curve increase in speed and with decrease in radius of curve decrease in both speed and radius of curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is considered to be the highest quality construction in the group of black top pavements? Bituminous carpet Sheet asphalt Mastic asphalt Bituminous concrete Bituminous carpet Sheet asphalt Mastic asphalt Bituminous concrete ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The terrain may be classified as rolling terrain if the cross slope of land is more than 60% upto 10% between 10% and 25% between 25% and 60% more than 60% upto 10% between 10% and 25% between 25% and 60% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of summit curves, the deviation angle will be maximum when an ascending gradient meets with a level surface an ascending gradient meets with another ascending gradient a descending gradient meets with another descending gradient an ascending gradient meets with a descending gradient an ascending gradient meets with a level surface an ascending gradient meets with another ascending gradient a descending gradient meets with another descending gradient an ascending gradient meets with a descending gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a single lane road with two way traffic, the minimum stopping sight distance is equal to three times the stopping distance two times the stopping distance half the stopping distance stopping distance three times the stopping distance two times the stopping distance half the stopping distance stopping distance ANSWER DOWNLOAD EXAMIANS APP