Highway Engineering The sequence of four stages of survey in a highway alignment is reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The recommended grade of tar for grouting purpose is RT-2 RT-3 RT-5 RT-1 RT-2 RT-3 RT-5 RT-1 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If aggregate impact value is 20 to 30 percent, then it is classified as satisfactory for road surfacing unsuitable for road surfacing exceptionally strong strong satisfactory for road surfacing unsuitable for road surfacing exceptionally strong strong ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of shoulders in water bound macadam roads is less than the cross slope of pavement zero equal to the cross slope of pavement greater than the cross slope of pavement less than the cross slope of pavement zero equal to the cross slope of pavement greater than the cross slope of pavement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The effect of grade on safe overtaking sight distance is to decrease it on descending grades and to increase it on ascending grades to increase it on both descending and ascending grades to decrease it on both descending and ascending grades to increase it on descending grades and to decrease it on ascending grades to decrease it on descending grades and to increase it on ascending grades to increase it on both descending and ascending grades to decrease it on both descending and ascending grades to increase it on descending grades and to decrease it on ascending grades ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is kerosene oil heavy diesel light diesel gasoline kerosene oil heavy diesel light diesel gasoline ANSWER DOWNLOAD EXAMIANS APP