Highway Engineering For highway geometric design purposes the speed used is 15th percentile 98 “”percentile 85th percentile 50 “”percentile 15th percentile 98 “”percentile 85th percentile 50 “”percentile ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The suitable surfacing material for a bridge deck slab is bituminous carpet rolled asphalt mastic asphalt sheet asphalt bituminous carpet rolled asphalt mastic asphalt sheet asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The rail is designated by its length weight per unit length weight cross-section length weight per unit length weight cross-section ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The absolute minimum radius of curve for safe operation for a speed of 110 kmph is 110 m 220 m 577 m 440 m 110 m 220 m 577 m 440 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Difference in level of two rails Vertical movement of rail Lateral movement of rail Longitudinal movement of rail Difference in level of two rails Vertical movement of rail Lateral movement of rail Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 mm its penetration value is 10 mm its penetration value is 8 to 10 cm its penetration value is 8 to 10 mm its penetration value is 8 mm its penetration value is 10 mm its penetration value is 8 to 10 cm its penetration value is 8 to 10 mm ANSWER DOWNLOAD EXAMIANS APP