Highway Engineering For highway geometric design purposes the speed used is 15th percentile 85th percentile 50 “”percentile 98 “”percentile 15th percentile 85th percentile 50 “”percentile 98 “”percentile ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In hill roads the side drains arc provided on both sides of road None of these only on the hill side of road only on the opposite side of hill on both sides of road None of these only on the hill side of road only on the opposite side of hill ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The background colour of the informatory sign board is red green white yellow red green white yellow ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The suitable surfacing material for a bridge deck slab is sheet asphalt rolled asphalt bituminous carpet mastic asphalt sheet asphalt rolled asphalt bituminous carpet mastic asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering A traffic rotary is justified where when traffic volume is less than 500 vehicles per hour when traffic volume is more than 5000 vehicles per hour space is limited and costly number of intersecting roads is between 4 and 7 when traffic volume is less than 500 vehicles per hour when traffic volume is more than 5000 vehicles per hour space is limited and costly number of intersecting roads is between 4 and 7 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 5.0 mm penetration only 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 5.0 mm penetration only ANSWER DOWNLOAD EXAMIANS APP