Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 4.00 cum 2.00 cum 1.00 cum 3.00 cum 4.00 cum 2.00 cum 1.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 1.00 kg 0.75 kg 0.50 kg 0.25 kg 1.00 kg 0.75 kg 0.50 kg 0.25 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 7.5 sqm 2.5 sqm 5.0 sqm 10 sqm 7.5 sqm 2.5 sqm 5.0 sqm 10 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings Water closets Lavatory basins All listed here Flushing pipes Water closets Lavatory basins All listed here Flushing pipes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ANSWER DOWNLOAD EXAMIANS APP