Building Construction Rotary drilling Hinders the ground water observations and permeability test Is not economical for holes of less than 10 cm All listed here Is not suitable for deposits containing very coarse gravel Hinders the ground water observations and permeability test Is not economical for holes of less than 10 cm All listed here Is not suitable for deposits containing very coarse gravel ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 3, 2, 5, 1, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 2, 1, 3, 5, 4 3, 2, 5, 1, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Queen closer may be placed In header course In header course next to first brick In stretcher course In stretcher course next to first brick In header course In header course next to first brick In stretcher course In stretcher course next to first brick ANSWER DOWNLOAD EXAMIANS APP
Building Construction The differential settlement in case of foundations on sandy soils should not exceed 65 mm 40 mm 25 mm 100 mm 65 mm 40 mm 25 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The width of the hollow space between two walls of a cavity wall should not exceed 15 cm 7.5 cm 10 cm 5 cm 15 cm 7.5 cm 10 cm 5 cm ANSWER DOWNLOAD EXAMIANS APP