Building Construction In case of multi-storeyed buildings, the forms to be removed first are All the above at the same time Sides of beams and girders Column forms Bottom of beams and girders All the above at the same time Sides of beams and girders Column forms Bottom of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 15 % 10 % 20 % 25 % 15 % 10 % 20 % 25 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as King closer Bevelled closer Half king closer Queen closer King closer Bevelled closer Half king closer Queen closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Scaffolding Jacking Underpinning Shoring Scaffolding Jacking Underpinning Shoring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is Disc pile Screw pile H-pile Pipe pile Disc pile Screw pile H-pile Pipe pile ANSWER DOWNLOAD EXAMIANS APP