Building Construction In case of multi-storeyed buildings, the forms to be removed first are Sides of beams and girders Column forms All the above at the same time Bottom of beams and girders Sides of beams and girders Column forms All the above at the same time Bottom of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 25 % 15 % 10 % 20 % 25 % 15 % 10 % 20 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as King closer Half king closer Bevelled closer Queen closer King closer Half king closer Bevelled closer Queen closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Scaffolding Shoring Jacking Underpinning Scaffolding Shoring Jacking Underpinning ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is H-pile Screw pile Disc pile Pipe pile H-pile Screw pile Disc pile Pipe pile ANSWER DOWNLOAD EXAMIANS APP