Building Construction In case of multi-storeyed buildings, the forms to be removed first are All the above at the same time Sides of beams and girders Bottom of beams and girders Column forms All the above at the same time Sides of beams and girders Bottom of beams and girders Column forms ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 10 % 25 % 20 % 15 % 10 % 25 % 20 % 15 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as Bevelled closer Queen closer Half king closer King closer Bevelled closer Queen closer Half king closer King closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Underpinning Scaffolding Jacking Shoring Underpinning Scaffolding Jacking Shoring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is Disc pile Pipe pile H-pile Screw pile Disc pile Pipe pile H-pile Screw pile ANSWER DOWNLOAD EXAMIANS APP