Building Construction In case of multi-storeyed buildings, the forms to be removed first are Bottom of beams and girders Column forms All the above at the same time Sides of beams and girders Bottom of beams and girders Column forms All the above at the same time Sides of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 15 % 10 % 25 % 20 % 15 % 10 % 25 % 20 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as King closer Queen closer Half king closer Bevelled closer King closer Queen closer Half king closer Bevelled closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Shoring Scaffolding Underpinning Jacking Shoring Scaffolding Underpinning Jacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is Screw pile H-pile Pipe pile Disc pile Screw pile H-pile Pipe pile Disc pile ANSWER DOWNLOAD EXAMIANS APP