Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as King closer Half king closer Queen closer Bevelled closer King closer Half king closer Queen closer Bevelled closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 4 days 14 days 7 days 1 day 4 days 14 days 7 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction The radial splits which are wider on the outside of the log and narrower towards the pith are known as Heart shakes Starshakes Rindgalls Cupshakes Heart shakes Starshakes Rindgalls Cupshakes ANSWER DOWNLOAD EXAMIANS APP
Building Construction The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than Half the column spacing Three-fourth the column spacing The column spacing One-third the column spacing Half the column spacing Three-fourth the column spacing The column spacing One-third the column spacing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept Less than its projection beyond wall base 10 cm Equal to its projection beyond wall base 15 cm Less than its projection beyond wall base 10 cm Equal to its projection beyond wall base 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Raking piles Sinking piles Construction piles Eccentric piles Raking piles Sinking piles Construction piles Eccentric piles ANSWER DOWNLOAD EXAMIANS APP