Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Pressure pile Simplex pile Franki pile Vibro pile Pressure pile Simplex pile Franki pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The under surface of an arch, is called Intrados Haunch Soffit Back Intrados Haunch Soffit Back ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Stability of structure Workability Strength All listed here Stability of structure Workability Strength All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 20 m 15 m 10 m 5 m 20 m 15 m 10 m 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 7 days 14 days 1 day 4 days 7 days 14 days 1 day 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Grillage foundation All listed here Is light and economical Is used to transfer heavy structural loads from steel columns to a soil having low bearing capacity Does not require deep cutting as the required base area with required pressure intensity is obtained at a shallow depth All listed here Is light and economical Is used to transfer heavy structural loads from steel columns to a soil having low bearing capacity Does not require deep cutting as the required base area with required pressure intensity is obtained at a shallow depth ANSWER DOWNLOAD EXAMIANS APP