Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Franki pile Pressure pile Vibro pile Simplex pile Franki pile Pressure pile Vibro pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Arches in the form of masonry arcs struck from more than four centres, are called Ogee arches Two curved arches Drop gothic arches Gothic arches Ogee arches Two curved arches Drop gothic arches Gothic arches ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be Equal to width of stairs One fourth the width of stairs Half the width of stairs Twice the width of stairs Equal to width of stairs One fourth the width of stairs Half the width of stairs Twice the width of stairs ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 3 6 4 5 3 6 4 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 2, 1, 3, 5, 4 3, 2, 5, 1, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 2, 1, 3, 5, 4 3, 2, 5, 1, 4 5, 4, 3, 2, 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The sound which continues even after its source is cut off, is called Intensity of sound Echo Interference Reverberation Intensity of sound Echo Interference Reverberation ANSWER DOWNLOAD EXAMIANS APP