Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Franki pile Pressure pile Vibro pile Simplex pile Franki pile Pressure pile Vibro pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Vertical construction joints are provided where the shearing forces are minimum in the case of Beams All of these Girders Slabs Beams All of these Girders Slabs ANSWER DOWNLOAD EXAMIANS APP
Building Construction The columns of multi-storeyed buildings are designed to withstand the forces due to All of these Dead loads Live loads Wind loads All of these Dead loads Live loads Wind loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 20 m 15 m 10 m 40 m 20 m 15 m 10 m 40 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Construction piles Eccentric piles Sinking piles Raking piles Construction piles Eccentric piles Sinking piles Raking piles ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Boning rod Levelling staff Steel tape Ranging rod Boning rod Levelling staff Steel tape Ranging rod ANSWER DOWNLOAD EXAMIANS APP