Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Franki pile Pressure pile Vibro pile Simplex pile Franki pile Pressure pile Vibro pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Increasing the depth of foundation Draining the soil Grouting Compacting the soil Increasing the depth of foundation Draining the soil Grouting Compacting the soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 300 to 350 mm 400 to 450 mm 500 to 550 mm 600 to 650 mm 300 to 350 mm 400 to 450 mm 500 to 550 mm 600 to 650 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Auger boring Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table Is the most primitive method for making a hole in the ground All of these Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table Is the most primitive method for making a hole in the ground All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of Raymond pile Diameter of pile at bottom varies from 20 cm to 28 cm All listed here Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m Diameter of pile at bottom varies from 20 cm to 28 cm All listed here Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction To construct a 10 cm thick partition wall, you will prefer Stretcher bond Flemish bond English bond Header bond Stretcher bond Flemish bond English bond Header bond ANSWER DOWNLOAD EXAMIANS APP