Building Construction The sound which continues even after its source is cut off, is called Interference Echo Reverberation Intensity of sound Interference Echo Reverberation Intensity of sound ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 40 to 65 mm 65 to 100 mm 25 mm 25 to 40 mm 40 to 65 mm 65 to 100 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Railings Balustrades Balusters Newel posts Railings Balustrades Balusters Newel posts ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as Bevelled closer Half king closer Queen closer King closer Bevelled closer Half king closer Queen closer King closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as Combined footing None of these Raft footing Strap footing Combined footing None of these Raft footing Strap footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Finishing of concrete Curing of concrete Compaction of concrete Placing of concrete Finishing of concrete Curing of concrete Compaction of concrete Placing of concrete ANSWER DOWNLOAD EXAMIANS APP