• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Building Construction

Building Construction
The floor is rubbed with oxalic acid, for making its surface

Glossy
Uniform
Durable
Free from voids

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The lower half portion between crown and skew back of the arch, is called

Soffit
Springing
Spandril
Haunch

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A wall constructed to resist the pressure of an earth filling, is called

Parapet wall
Buttress
Retaining wall
Breast wall

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The vertical distance between the springing line and highest point of the inner curve of an arch is known as

Intrados
Spandril
Extrados
Rise

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is,

Q = (W × 2.5)/6 (S + h)
Q = (W × 6)/h (S + 2.5)
Q = Wh/2.5 (S + 6)
Q = Wh/6 (S + 2.5)

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A floor constructed with the 4 to 6 mm marble chips, is known

Chip floor
Reinforced marble floor
Marble floor
Terrazzo floor

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑