Building Construction The form work from the sides of beams can be removed only after 4 days 7 days 1 day 14 days 4 days 7 days 1 day 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The disease of dry rot in timber is caused by None of these Complete submergence in water Alternate wet and dry conditions Lack of ventilation None of these Complete submergence in water Alternate wet and dry conditions Lack of ventilation ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads Stretcher bond is generally used for the construction of brick corbel ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 3.5 m or less 5 m but less than 6.5 m 6.5 m but less than 8 m 3.5 m but less than 5 m 3.5 m or less 5 m but less than 6.5 m 6.5 m but less than 8 m 3.5 m but less than 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Raft foundation are generally preferred to when the area required for individual footing, is more than 25% to total area 50% of total area 40% to total area 30% of total area 25% to total area 50% of total area 40% to total area 30% of total area ANSWER DOWNLOAD EXAMIANS APP