Building Construction The form work from the sides of beams can be removed only after 14 days 1 day 7 days 4 days 14 days 1 day 7 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dado is usually provided in Verandah (belcony) Bath rooms Dining halls Living rooms Verandah (belcony) Bath rooms Dining halls Living rooms ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical faces of a door opening which support frame of the door, are Styles Posts Reveals Jambs Styles Posts Reveals Jambs ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: Area of footing slab = 11.00 m2 All listed here Distance of G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 All listed here Distance of G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following rocks is used for monumental buildings? Slate Marble Granite Sand stone Slate Marble Granite Sand stone ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Lintel Bed block Perpend Vertical line Lintel Bed block Perpend Vertical line ANSWER DOWNLOAD EXAMIANS APP