Building Construction

Building Construction
The form work from the sides of beams can be removed only after

1 day
14 days
7 days
4 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The mortar in which both cement and lime are used as binding materials, is called

Lime mortar
Cement mortar
Gauged mortar
Fire resistant mortar

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The depth of concrete bed of the foundation depends upon

The mix of the concrete
The projection of the concrete block beyond the footing over it
All listed here
The upward soil pressure

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
To obtain good bonding in brick masonry

Vertical joints in alternate courses are kept in plumb line
Bats are used where necessary
All of these
First class bricks are used

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
According to National Building Code, the hydrants in water mains is provided at minimum interval of

75 m
60 m
50 m
90 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then

d = 0.775 a
d = 0.557 a
None of these
d = 0.445 a

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑