Building Construction The form work from the sides of beams can be removed only after 14 days 7 days 1 day 4 days 14 days 7 days 1 day 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called Brick held vertically Brick on bed Brick on end Brick on edge Brick held vertically Brick on bed Brick on end Brick on edge ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of Stretcher bond Header bond Single Flemish bond English bond Stretcher bond Header bond Single Flemish bond English bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 in 10 1 in 5 1 to 50 1 in 20 1 in 10 1 in 5 1 to 50 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The mortar in which both cement and lime are used as binding materials, is called Gauged mortar Fire resistant mortar Cement mortar Lime mortar Gauged mortar Fire resistant mortar Cement mortar Lime mortar ANSWER DOWNLOAD EXAMIANS APP