Building Construction The form work from the sides of beams can be removed only after 1 day 14 days 4 days 7 days 1 day 14 days 4 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to stretcher course, the thickness of joints in header course should be Equal Equal or more Less More Equal Equal or more Less More ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lintels are preferred to arches because Arches require strong abutments to withstand arch thrust Arches are difficult in construction Arches require more headroom to span the openings like doors, windows etc. All of these Arches require strong abutments to withstand arch thrust Arches are difficult in construction Arches require more headroom to span the openings like doors, windows etc. All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 10 m 20 m 15 m 5 m 10 m 20 m 15 m 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Eave Crown Rafter Ridge Eave Crown Rafter Ridge ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 45 mm 35 mm 15 mm 25 mm 45 mm 35 mm 15 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP