Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Under pinning Scaffolding Dead shore Raking shore Under pinning Scaffolding Dead shore Raking shore ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to National Building Code, the hydrants in water mains is provided at minimum interval of 75 m 90 m 50 m 60 m 75 m 90 m 50 m 60 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 15 mm 45 mm 25 mm 35 mm 15 mm 45 mm 25 mm 35 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Raft footing Strap footing Strip footing Combined footing Raft footing Strap footing Strip footing Combined footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 3 meters 2 meters 1 meter 4 meters 3 meters 2 meters 1 meter 4 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.35 du 1.25 du 1.75 du 1.5 du 1.35 du 1.25 du 1.75 du 1.5 du ANSWER DOWNLOAD EXAMIANS APP